Quantity Surveying Building Estimation With Cad And Excel

  • 4.5
40 hours on-demand video
$ 14.99

Brief Introduction

Quantity Surveying,Quantity Takeoff,Steel Estimation,Rate Analysis,B.O.Q,Payments To Contractor,Interim Payment In Excel

Description

Complete Updated Course Last Update 09/2021

Complete Package.

  1. Complete Project Estimation Through AutoCAD And Excel.


  2. Complete Project Estimation (Manual Calculations PDF Drawings Same Project.)


  3. Complete Project Estimation (Through Plan Swift Software  Same Project)


  4. Primavera P6 Training For Beginners.


  5. We Will Create Complete Project In Primavera P6 (Same Project For Which We did Estimation)


  6. MS Project 2019 Training For Beginners


  7. We Will Create Complete Project In MS PROJECT  (Same Project For Which We did Estimation)


  8. Excel Training For Beginners.


  9. Autocad Training For Beginners.

Welcome to Quantity Surveying /Building Estimation online training course. it is focused on practical application of Estimation using Auto Cad & M.S Excel 

This course is a field oriented course and contains real examples and a full fledge real project for better understanding

After successful completion of this course, you will be able to Estimate Any Building Project (From Foundation To Finishing)

Major Topics That We Will Learn In This Course:

Quantity Of Substructure (Isolated Footing) Through AutoCAD

  1. Excavation Quantity

  2. Formwork Calculations

  3. Concrete Quantity

Quantity Of Sloped Footing Through AutoCAD

  1. Excavation Quantity

  2. Formwork Calculations

  3. Concrete Quantity

Quantity Of Raft Foundation Through AutoCAD

  1. Excavation Quantity

  2. Formwork Calculations

  3. Concrete Quantity

Quantity Of Different Items In Superstructure  Through AutoCAD

  1. Column In S.S (Formwork, Concrete)

  2. Grade Beams (Formwork ,Concrete )

  3. Slab On Grade (Formwork , Concrete)

  4. Lintel And Top Beam (Formwork , Concrete)

  5. Slab (Concrete And Formwork)

  6. Brick Works

  7. Plaster Works

  8. Tile And Marble Works

  9. Paint Works

Quantity Of Substructure (Isolated Footing) Manual Calculations PDF File Or Hard Copy Of Drawings

  1. Excavation Quantity

  2. Formwork Calculations

  3. Concrete Quantity

Quantity Of Different Items In Superstructure  Through PDF File, Manual Calculations

  1. Column In S.S (Formwork ,Concrete)

  2. Grade Beams (Formwork ,Concrete )

  3. Slab On Grade (Formwork , Concrete)

  4. Lintel And Top Beam (Formwork , Concrete)

  5. Slab (Concrete And Formwork)

  6. Brick Works

  7. Plaster Works

  8. Tile And Marble Works

  9. Paint Works

Quantity Of Substructure (Through Planswift)

  1. Excavation Quantity

  2. Formwork Calculations

  3. Concrete Quantity

Quantity Of Different Items In Superstructure (Through Planswift)

  1. Column In S.S (Formwork, Concrete)

  2. Grade Beams (Formwork, Concrete )

  3. Slab On Grade (Formwork, Concrete)

  4. Lintel And Top Beam (Formwork, Concrete)

  5. Slab (Concrete And Formwork)

  6. Brick Works

  7. Plaster Works

  8. Tile And Marble Works

  9. Paint Works

Bar bending Schedule:

  1. Bar-bending Schedule Of Isolated Footing

  2. Bar-Bending Schedule Of Raft Foundation

  3. Bar-bending Schedule Of Column Necks And Columns

  4. Bar-bending Schedule Of Beams

  5. Bar-bending Schedule Of Stairs

  6. Bar Bending Schedule Of Slab

  7. Bar-Bending Schedule Of Two Way Slab

Rate Analysis Of Different Works:

  1. Rate Analysis For Excavation

  2. Rate Analysis For Plain Cement Concrete (P.C.C)

  3. Rate Analysis For Reinforcement Concrete (Column Beam And Slab)

  4. Rate Analysis For Masonry Work

  5. Rate Analysis For Plaster Work

  6. Rate Analysis For Tile Work

  7. Rate Analysis For Paint Work

Material Statement :

  1. Material Statement In Excel

Bill Of Quantity (B.O.Q)

  1. Bill Of Quantity For A Project According To CSI Codes

Mode Of Payments To Contractor

  1. Interim Payment

  2. Advance Payment

  3. Secured Advance

  4. Petty Advance

  5. Mobilization Advance

  6. Procedure To Create Interim Payment In Excel From Scratch.

Primavera P6 Training For Beginners

  1. As We are Doing Same Project In Primavera So This Training Is For Those Who Are Beginners In Planning OR In Primavera.

Complete Project In Primavera P6 With The Help Of MS Excel.

  1. Creating Activity List In Ms Excel.

  2. Add Manpower And Their Productivity In MS Excel

  3. Adding Duration To Activities Based On Productivity

  4. Creating Project In Primavera P6

  5. Importing All Of Activities From Excel To P6

  6. W.B.S And Relationship For Activities

  7. Creating And Assigning Resources To Activities (Work And Material Resources)

  8. Update The Project According To Actual (Time And Cost)

MS PROJECT Training For Beginners

  1. As We are Doing Same Project In MS Project So This Training Is For Those Who Are Beginners In Planning OR In MS Project.

Complete Project In MS Project With The Help Of MS Excel.

  1. Creating Activity List In Ms Excel.

  2. Add Manpower And Their Productivity In MS Excel

  3. Adding Duration To Activities Based On Productivity

  4. Creating Project In MS Project

  5. Importing All Of Activities From Excel To MS Project

  6. W.B.S And Relationship For Activities

  7. Creating And Assigning Resources To Activities (Work And Material Resources)

  8. Update The Project According To Actual (Time And Cost)

Excel Training For Beginners

  1. As Excel Is Important For This Course So I Have Add Basic Training And Formulas For Those Who Are Beginners In Excel

Auto-cad Training

  1. As Auto-cad Is Also Essential For This Course So I Have Also Included Auto-cad Training For Those Who Are Beginner In Auto-cad



Requirements

  • Requirements
  • • To have the Auto Cad And M.S Excel installed in your computer.
  • • To have the minimum understanding for Civil Quantity/Estimation
  • • To have a minimum understanding of construction processes.

Knowledge

  • Estimation Of Complete Project Through Auto-cad And Excel
  • Estimation Of Complete Project Through PDF Files/Hard Copy
  • Beginner Training For Plan Swift
  • Estimation Of Complete Project Through Plan Swift Software
  • Bar bending Schedule Of Foundation,Columns,Beams,Slab,Stairs, In Excel
  • How to Find Material Like Cement,Sand,Coarse Aggregates,Bricks
  • Complete Material Statement In Excel
  • Rate Analysis For Different Works Like ,Excavation, P.C.C, R.C.C, Masonry, Tiles, Plaster, Paint In Excel
  • Will Learn How to Create B.O.Q Of Project
  • Mode Of Payments To Contractor
  • Interim Payment In Excel
  • Microsoft Excel For Beginners
  • Primavera P6 Training For Beginners
  • Auto-cad 2020 For Beginners
  • MS Project Training For Beginners
  • Activities And W.B.S List In MS Excel
  • Adding Manpower In Excel (Labor, Mason, Carpenter etc.)
  • Finding The Duration Of Activities Based On Productivity
  • Complete Project In Primavera p6 (Activities ,W.B.S, Relationship, Creating And Assigning Resources And Much More
  • Complete Project In MS PROJECT (Activities ,W.B.S, Relationship, Creating And Assigning Resources And Much More
$ 14.99
English
Available now
40 hours on-demand video
Mudessar Afraz
Udemy

Instructor

Mudessar Afraz

  • 4.5 Raiting
Share
Saved Course list
Cancel
Get Course Update
Computer Courses